Project Name | Inner Mongolia Baotou Jiuqu Hotel | Project Introduction | Indoor P4 main screen 2304 × 1024, auxiliary screen 640 × one thousand and twenty-four × 2 wave screen 13248 × six hundred and forty. |
---|---|---|---|
Project Date | 2021.05 | Equipment used | LS2,LS16,LS4,G612*280 |
Project Location | Baotou, Inner Mongolia | Project Requirements | 1. Centralized control by one computer, which can be opened or closed. The wave screen is misaligned and needs to be offset. |