Project Name | Exhibition Hall of Jingyu Industry Co., Ltd | Project Introduction | 1.5 conventional LED screens 2.1 three side immersion 3.1 LCD screens 4.2 column screens |
---|---|---|---|
Project Date | 2022.07 | Equipment used | F2、Kapollo |
Project Location | Shanghai | Project Requirements | 1. One computer is centrally controlled to ensure smooth playback without jamming. 2. Play through the tablet control, switch materials and plans. 3. The display effect should be clear, and the screen should have a good picture taking effect. |