Project Name | Shenzhen Futian Financial Innovation Center | Project Introduction | An approximate 8K screen |
---|---|---|---|
Project Date | 2021.06 | Equipment used | Kommander F2、KS9800、Kapollo |
Project Location | Futian District, Shenzhen | Project Requirements | Shenzhen Futian financial technology innovation center is an important strategic platform for Shenzhen Hong Kong financial cooperation. The project uses a complete set of broadcast control equipment of Cassida to carry an approximate 8K screen to ensure t |
View all cases
-
Shandong Jinan Shangang Party Construction Exhibition Hall
Project Name:Shandong Jinan Shangang Party Construction Exhibition Hall
Project Date:2021.05
Project Location:Jinan City, Shandong Province
Project Introduction:1. One main screen and two screens are on the front, with a total number of points of 4608 * 1664 2 On the back is 5 vertical strip screens, with a total number of 2624 * 3328 points.
-
Chongqing Chang'an immersive LED display
Project Name:Chongqing Chang'an immersive LED display
Project Date:2020.12
Project Location:Chongqing
Project Introduction:5 screens, front can be opened or closed
-
Gansu Baiyin cultural and creative center
Project Name:Gansu Baiyin cultural and creative center
Project Date:2020.12
Project Location:Baiyin City, Gansu Province
Project Introduction:1. 12 column screens and one sky screen; 2. One tunnel screen; 3. A three fold display strip screen.
-
An exhibition hall in Hangzhou
Project Name:An exhibition hall in Hangzhou
Project Date:2020.07
Project Location:Hangzhou, Zhejiang Province
Project Introduction:P1.53 Small spacing immersive experience hall
-
Exhibition hall of Beijing Pinggu chicken Incubation Park
Project Name:Exhibition hall of Beijing Pinggu chicken Incubation Park
Project Date:2021.05
Project Location:Beijing
Project Introduction:1. A main screen on the front
-
Guizhou liuzhi project
Project Name:Guizhou liuzhi project
Project Date:2019.12
Project Location:Guizhou
Project Introduction:P4 arch screen, each arch is 128 points wide and 3286 points long, forming an arch tunnel.
-
Industrial and Commercial Bank of China Guizhou New Sub branch Hall
Project Name:Industrial and Commercial Bank of China Guizhou New Sub branch Hall
Project Date:2022.07
Project Location:Ninghe District, Tianjin
Project Introduction:1. Two U-shaped strip screens on the front 2. One interactive ground screen.
-
National phosphorus resources development and Utilization Engineering Technology Research Center
Project Name:National phosphorus resources development and Utilization Engineering Technology Research Center
Project Date:2021.03
Project Location:Yunnan
Project Introduction:1. A horn cylindrical screen in the exhibition hall of the research center
-
Jurong Wuyue Plaza KTV
Project Name:Jurong Wuyue Plaza KTV
Project Date:2020.09
Project Location:Jurong City, Jiangsu Province
Project Introduction:1. A door frame screen on the front covers the whole door frame. 2. There is a small screen on the left and right of the door channel.