Project Name | Heze Ski Resort | Project Introduction | Tunnel screen, module p3-2038s, tunnel screen is 5696x2816 long, and another half of the round screen is the top of the tunnel. |
---|---|---|---|
Project Date | 2020.09 | Equipment used | LS16*2、LS2*1、F2*1、G612*200 |
Project Location | Heze City, Shandong Province | Project Requirements | Picture synchronization; Uniformly control the playback of all screens; Maximize playback effect. |