Project Name | Zhengzhou Telecom Administration of Henan Province | Project Introduction | |
---|---|---|---|
Project Date | 2020.07 | Equipment used | S4、G612 |
Project Location | Zhengzhou Henan | Project Requirements |
View all cases
-
Kunming chengguan command center
Project Name:Kunming chengguan command center
Project Date:2020.01
Project Location:kunming
Project Introduction:P1.6
-
Hebei Baoding xiongan emergency command center
Project Name:Hebei Baoding xiongan emergency command center
Project Date:2021.06
Project Location:Baoding, Hebei
Project Introduction:1.53 module, 4-way 4K input, realizing perfect point-to-point
-
Shenzhen bay port monitoring conference
Project Name:Shenzhen bay port monitoring conference
Project Date:2018.10
Project Location:Shenzhen
Project Introduction:屏点数4608*1280
-
A headquarters in Changzhou City, Jiangsu Province
Project Name:
Project Date:2020.11
Project Location:Changzhou City, Jiangsu Province
Project Introduction:P2 module l screen resolution 160 × 80 vertical screen resolution 7680 × 1840 ground screen resolution 7680 × six thousand eight hundred and eighty
-
Dispatching Hall of Hengyang water supply company
Project Name:Dispatching Hall of Hengyang water supply company
Project Date:2022.02
Project Location:Hunan
Project Introduction:P1. 25 module large screen points 5120 * 1920
-
Centralized control room of Chengdu environment group
Project Name:Centralized control room of Chengdu environment group
Project Date:2021.11
Project Location: Chengdu, Sichuan
Project Introduction:1.P1. 53 high brush module 2 Full screen resolution: 9568x2392
-
Shanxi Lubao group data center
Project Name:Shanxi Lubao group data center
Project Date:2022.01
Project Location:Changzhi City, Shanxi Province
Project Introduction:1. There is an arc-shaped main screen on the front.
-
Taini (Shaoguan) Cement Co., Ltd
Project Name:Taini (Shaoguan) Cement Co., Ltd
Project Date:2021.11
Project Location:Shaoguan City, Guangdong Province
Project Introduction:1. P1 with an arc in the middle 86led large screen 2 There are 2 * 3 LCD screens on both sides, which are required to be displayed synchronously
-
Sichuan zigong artesian district headquarters
Project Name:Sichuan zigong artesian district headquarters
Project Date:2020.01
Project Location:Sichuan
Project Introduction: